Engineering is hard. Start by not making it harder.

A starter kit from HiQ: a short survey for development teams and four system signals to read alongside it.

A change is ready, and then it waits. In a build queue. For a first review. For access to a test environment or a test rig. For someone on another team to approve. None of it shows up as a line in the plan, but it adds up to a lot of engineering time.

Your teams already know where work gets stuck. What is often missing is a way of asking that makes the answers add up across a team. The kit gives you that: seven questions, and four signals your tools already log. Together they show where to look closer. Take out the waiting, not the safeguards: review, testing, verification and compliance stay. Move fast. Break nothing.

What you get in the guide

  • The survey. Seven short questions for a development team: what is hard that should be easy, what works well enough to protect, and how much each kind of friction slows people down. Includes a suggested invitation and advice on sending it and reading the answers.
  • Four system signals that your build and review tools already log, each mirroring a row in the survey: Build and test feedback time; Unreliable results; Time to first review; Release lead time.
  • How to read them together. Where survey and signals agree, you know where to start. Where they disagree, you have found something worth a conversation.
  • Ground rules. Never for individuals, and never tied to pay. Report at team level only. Compare with yourselves over time, not with other organisations.
  • Further reading on developer experience and developer productivity.

Who it is for

Heads of development and R&D, engineering managers, platform and DevOps leads, and CTOs at technology-intensive companies. Also useful for tech leads and the people who run build pipelines and code review.

Works where releases follow a programme

The kit also covers hardware-coupled development, where release dates are fixed by a programme and access to test rigs is part of the picture. In those cases you measure release lead time to the first release candidate or integrated build.

About the talk

The guide builds on Markus Bergland’s talk on Developer Productivity.

Get the kit

  1. Want to compare notes on what you find? Let’s talk.

More E-books